PQIS Ltd.Mar 251 min readPQIS Power factor Correction InstallationPFC maintenance carried out on a unit installed by PQIS in Glasgow March 2024.PF Corrected from 0.84 to 1.00 reducing maximum demand and costs.
PFC maintenance carried out on a unit installed by PQIS in Glasgow March 2024.PF Corrected from 0.84 to 1.00 reducing maximum demand and costs.
Comments