top of page
Search
Writer's picturePQIS Ltd.

Power Factor Correction Unit Maintenance 2024

PFC Maintenance carried out on a 300KVAR unit installed by PQIS for industrial business in Manchester, April 2024.


Power Factor corrected from 0.78 to 1.00 reducing maximum demand and cost.





20 views1 comment

Recent Posts

See All

1 Comment


"Incorporating discussions about power factor correction unit maintenance into Critical Care Nursing Topics is critical. These units are critical in ensuring that life-saving equipment receives consistent power. Regular maintenance protects against potential disruptions, ensuring ongoing patient care.

Like
bottom of page
Engineering Directory - Directory listing UK engineering companies. UK Directory Listings of Electrical Services Companies - Provided by the Business Directory UK